Siemens Tecnomatix - Simulation Aided Scheduling Tool for Reconfigurable Assembly System

Closed Posted 2 years ago Paid on delivery
Closed Paid on delivery

Related to Model, SimTalk 2.0

Simulation Aided Scheduling Tool for Reconfigurable

Assembly Systems

The process:

1. Build the simulation in 2D.

2. Build the flow process for each product.

3. Insert average processing time (refer table) for each step.

4. Insert the number of products that arrive for each product (refer table, already

highlighted).

5. Insert the working hour shift

a. Shift 1: 0830 – 1230

b. Shift 2: 1330 – 1730

c. Monday -Friday only

6. The simulation needs to identify the number of days that every product will complete

based on the average processing time, working hour shift, the number of products that

arrive.

To build the model you can use anything you what related to Tecnomatix Plant

Simulation 15 such as MU, Method and etc

For the result, I need:

• Number of days for each product to finish

• Display in Gantt Chart.

Manufacturing Design Assembly Computer Aided Manufacturing Arena Simulation Programming Manufacturing Engineering

Project ID: #30655672

About the project

1 proposal Remote project Active 2 years ago

1 freelancer is bidding on average $200 for this job

amarvnit22

AN OVERVIEW ~ Offering over 6+ years of experience~ Work as Discrete Event Simulation Engineer for FMCG Work as Method Engineer in Aerospace Manufacturing Plant Proficient communication and inter-personal skills. Atti More

$200 USD in 7 days
(0 Reviews)
0.0