I need 2 machines scheduling optimization
Closed
Posted
3 years ago
Paid on delivery
$2-8 AUD / hour
Closed
I need you to optimize 2 wire drawings (reducing the size of wire) m/cs with 25 different sizes. more details in the chat box
Project ID: #26641585
About the project
9 proposals
Remote project
Active 3 years ago