switching 4 leg HAPF in simulink using MPC
$10-50 USD
Paid on delivery
i want to know how to switch 3 phase 4 leg inverter use as an Active power filter in shunt hybrid power filter with a pasive filter using MPC, based on paper by K. Antoniewicz, Model Predictive Control for Three-Level Four-Leg Flying Capacitor Converter Operating as Shunt Active Power Filter
Project ID: #19588315
About the project
2 freelancers are bidding on average $53 for this job
Hi, I am interested in this task. My Master thesis is about Nonlinear Model Predictive Control. May i know the details of the task? Thank you and best regards, Imam