Work breakdown structure drupal jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Type
Skills
Languages
    Job State
    30 work breakdown structure drupal jobs found, pricing in CAD
    Prezi presentation 6 days left
    VERIFIED

    ...======================================= The Best Solution For Your eCommerce Shopify Development (and logo) Magento Development (and logo) Woo Commerce Development (and logo) Drupal commerce Development (and logo) Fully Custom Development (and logo) By understanding your business goals, we can assist with the platform choice that best fits your online

    $161 (Avg Bid)
    $161 Avg Bid
    15 bids
    ShopEllen 2019 6 days left
    VERIFIED

    I need some changes to an existing website. Looking for a Drupal developer who can work on an existing code base which is in final phase of development and deploy it ASAP. Type - E-commerce website What's available - The website is ready from core function point of view. What's expected - 1. There is a need to perform UI beautification as this

    $91 (Avg Bid)
    $91 Avg Bid
    6 bids

    I have existing villa building. I want to extend a new building attached to the existing. I need load calculations and Steel tapping to existing beams details. The drawing will be shared once agreed

    $45 (Avg Bid)
    $45 Avg Bid
    7 bids

    Need a Preschool Franchise Department structure as follows: 1. Head of Franchise reporting to CEO 2. Franchise Aquisition Executive - 4 (they will be deployed for 4 individual zones as Territory Incharge for their respective zones) 3. Operations Manager - 2 (Each Operation Manager will cater to 10 centres) 4. Academic Program Specialist - 1 5.

    $17 (Avg Bid)
    $17 Avg Bid
    2 bids

    I have a website running on Drupal 7. Now I want to move front end from Drupal to Angular. All APIs should be created on Drupal side using it's database and other functions AND should be consumed on front end. We have 3 logins, [login to view URL], [login to view URL], 3. admin, we need to move all functionalities from customer and staff logins to angular

    $2319 (Avg Bid)
    $2319 Avg Bid
    55 bids

    We need an theme incl. Headbanner / Logo for an Drupal website for an Clash of Clan Clan website. The Clan is called PlusTube and the domain name is [login to view URL] The file i uploaded is the sign of our Clan.

    $151 (Avg Bid)
    $151 Avg Bid
    20 bids

    I have a website hosted on Godaddy and i am using Drupal as CMS. I have installed few modules on my website and i am receiveing errors. Someone who can fix the error will be rewarded.

    $117 (Avg Bid)
    $117 Avg Bid
    10 bids

    The website has been started. The modules have been installed. The basics are there. IT NEEDS: 1) To be made mobile-first responsive. There is only page.tpl.php. The code already exists, needs to be cleaned up, and also applied to header and footer regions. 2) A views page that displays 8 top navigation menu items graphically in boxes, also mobile-first reponsive (one column on cellphon...

    $256 (Avg Bid)
    $256 Avg Bid
    27 bids

    I need to prepare all documents for my private fund 1 Billion USD , unit value 10k USD investing in hotels, hospitals, malls, trading centers, warehouse, in Saudi, UAE, Kuwait I need a professional to help in preparing all templates and documents Thanks

    $973 (Avg Bid)
    $973 Avg Bid
    6 bids

    I have a drupal 7 website that am redesigning and i need help with completing some part on data visualization, its specifically creating some drupal views that we present data as analytics, its a like 4 - 7 charts, graphs or map overlay that i need to finish, the step up is drupal 7, views and D3js. The integration of the required libraries is already

    $325 (Avg Bid)
    $325 Avg Bid
    7 bids

    Anyone who is good in steel structure can help me. ETABS model is must.

    $57 (Avg Bid)
    $57 Avg Bid
    14 bids

    I need a Preschool Franchise Department structure as follows: Head of Franchise reporting to CEO Franchise Aquisition Executive - 4 (they will be deployed for 4 individual zones as Territory Incharge for their respective zones) Operations Manager - 2 (Each Operation Manager will cater to 10 centres) Academic Program Specialist - 1 Support content

    $25 (Avg Bid)
    $25 Avg Bid
    2 bids

    we looking for a developer for coding a new module in drupal 8 this module is temperature charts with differents pages and sessions users. The users must be save the charts months by monts or add anotations on the charts.

    $334 (Avg Bid)
    $334 Avg Bid
    19 bids

    IOS, C++, Swift, Android, JAVA 30-45 min coding exercise.

    $38 (Avg Bid)
    $38 Avg Bid
    6 bids

    [login to view URL] if you will scroll this website there are directors now if u click on anywhere visit any profile like this [login to view URL] u will see CURRICULUM this button is not working and here its working [login to view URL] its showing publications

    $28 / hr (Avg Bid)
    $28 / hr Avg Bid
    39 bids

    We are looking for something similar to the link below [login to view URL]

    $648 (Avg Bid)
    $648 Avg Bid
    20 bids

    We’re looking for an amazing person who is committed to helping others. We work with web hosting customers from all over the world, and with that comes an endless amount of challenges and learning experiences. Schedule - All on Eastern Time (Toronto) : Saturday-Wednesday 10AM-7PM Wednesday-Sunday 10AM-7PM Responsibilities and Duties: Solve their

    $15 / hr (Avg Bid)
    $15 / hr Avg Bid
    11 bids

    I have a very simple "attendance list" for andro...is almost ready but i can't do this part with firestore I need to check/uncheck the checkboxs for one or more users in the list and save the list in DB So I need you to structure it for me on the Firebase. Try yourself if you can do this and only after this make me a offer. App-Design is not needed

    $99 (Avg Bid)
    $99 Avg Bid
    7 bids
    Digital Advertising 2 days left
    VERIFIED

    ...DOCUMENT WITH THE BREAKDOWN OF THE TYPES OF ADVERTING YOU WOULD USE, AND THE EXPECTED ROI. At the end of each month I'll need a report on how the adverting campaigns are going. I'm meeting with the client in the coming days and will present the proposal to him. If the client likes proposal and chooses to go ahead you will get the work....

    $1604 (Avg Bid)
    $1604 Avg Bid
    41 bids

    I want to change some of html structure and simple wp plugin on a site. This project is very simple and has to complete on teamviewer. My budget is 10$.

    $24 (Avg Bid)
    $24 Avg Bid
    9 bids

    I need a new Drupal website. Copy design, layout, modules, plugings from existing websites. Contents will be provided by me. need to make some changes in designing, so that it doesn't look like it's copied.

    $92 (Avg Bid)
    $92 Avg Bid
    4 bids
    Insurance app 2 days left

    So, our Insurance client requires an app which looks like the following - 1st phase - GPS based app to find vehicle for recovery after breakdown. API integration with a system called APEX and there back end systems who recover the vehicle Integration with Insurers CRM system (s) TBC Once recovered a small reporting system in the app integrated

    $4220 (Avg Bid)
    $4220 Avg Bid
    119 bids

    ...feed in terms of ranking “top ranking users with the most number of live viewers will be shown at the top” • Explore icon (Will display all live feeds by a few categories breakdown – Newest users, Nearby users, hot list, search bar) • Video icon at the center to start a live feed (User have to create a live feed title and hashtag, location and social

    $4464 (Avg Bid)
    $4464 Avg Bid
    76 bids

    We need a TEXT ONLY (does not need graphics) Power Point slides created from thi...goal is to explain it with slides! It needs to be make into an easy-to-understand series of simple slides! Please do not bid if the article is too confusing for you to breakdown into slides. Please make sure to indicate in your bid that you do understand the article!

    $101 (Avg Bid)
    $101 Avg Bid
    40 bids
    Drupal Expert Need 1 day left
    VERIFIED

    please check project details in attachment

    $265 (Avg Bid)
    $265 Avg Bid
    12 bids

    We have a website built in Drupal and have some changes needed. Will share details via interview.

    $248 (Avg Bid)
    $248 Avg Bid
    25 bids

    We want to integrate Zoho SalesIQ to our website to have a livechat.

    $315 (Avg Bid)
    $315 Avg Bid
    19 bids

    I need someone to install a module/theme (not sure which one it is) on my drupal site. I cannot get it to work. Everytime I go to install, I am just brought to a page not found drupal page.

    $45 (Avg Bid)
    $45 Avg Bid
    21 bids

    Our project is with API platform, we have a new database structure to integrate into the API platform

    $207 (Avg Bid)
    $207 Avg Bid
    24 bids
    Data mining in Matlab -- . 5 days left
    VERIFIED

    I need the data miner expert in Matlab - Should know - decision. Trees and K means I need the report + power point by using this structure - Title - Authors - Abstract - Introduction - Data pre-processing - Data mining methods - Model evaluation - Conclusion - Reference - Appendix The report could be 7 max pages Need this to be done as soon as possible

    $140 (Avg Bid)
    $140 Avg Bid
    3 bids