Cancelled

Analyze some Data - Repost - open to bidding

Project Notables:

- Due Thursday, 17th April

- Expected job time - 1-3hrs

- Thorough understanding of MatLab/Microsoft Excel and similar programs and how to analyse data

- 4th year Engineering Assessment

Project Details:

This semester I am completing a subject at university which involves me writing a thesis on a topic of my choice. The topic I have chosen is 'A Performance Evaluation on the Brisbane Ferries and CityCat.' Along with the chosen topic, I was advised by my topic supervisor to direct my topic in one direction (as a performance evaluation includes such a broad scope) - and from there I decided to analyse 4 components that have have a significant effect on the ferry's performance. They include:

- Ferry on-time performance

- How the increase in fare prices reduces passenger volumes

- How terminal Dwell times effect the overall efficiency of the ferry's.

- The change of Translink Peak Hour times ([url removed, login to view])

I have been supplied with data for the analysis. The data is in the form of excel spreadsheets. (they are 4 spreadsheets - March, April, May and June 2013) I would say each row is a passenger touch on the Gocard (for people unaware of the Gocard ticketing system - [url removed, login to view]) reader, and each column shows a piece of information for that touch (e.g. time, stop ID, fare)

All data is on Dropbox so if interested, I will invite you to the containing folder.

The metadata provided shows the meaning of each column (feature) of each Gocard transaction

e.g.

operator VARCHAR(25) NULL,

operations_date DATETIME NULL,

run VARCHAR(8) NULL,

route VARCHAR(20) NULL,

service VARCHAR(8) NULL,

direction VARCHAR(8) NULL,

scheduled_start DATETIME NULL

This means that the 1st column is Operator, 2nd column is Operation date, etc. For your analysis you might be interested in operations_date, smartcard,boarding_time,direction,fare. Just a suggestion, look for the column you need for your analysis.

What I am aiming for is being able to recognize a trend in the data over the course of the 4 month period - and then being able to elaborate on the way in which these variables have effected the ferry network performance.

Additional Ferry Information:

- [url removed, login to view]

- [url removed, login to view]

Thanks,

Tom

Skills: Data Processing, Matlab and Mathematica

See more: tom ferry, time in brisbane, time brisbane, june is the month for, job in brisbane, job id card, job brisbane, job at brisbane, i need a direction for writing, for the month of june, excel for data analysis, e ticketing system project, engineering supervisor, engineering brisbane, brisbane job, brisbane engineering, brisbane au, assessment analysis writing, analyze your writing, microsoft spreadsheets, how to microsoft excel, wikipedia service, writing matlab, thesis writing service, smartcard

About the Employer:
( 0 reviews ) singapore, Singapore

Project ID: #5814054