Olympic cost over-runs infographic
- Status: Closed
- Prize: $75
- Entries Received: 8
- Winner: richardwct
Contest Brief
I need an infographic about the potential 2026 Calgary Olympic winter games bid. I'd like to use some stylized cartoon-ish graphics of Calgary, Canada landmarks in the background and/or olympic sport cartoon-ish graphics and then show the cost overruns from the last 10 winter olympics as detailed on table 3 in this report: http://eureka.sbs.ox.ac.uk/6195/1/2016-20.pdf
Maybe a bar chart or some other visualization of the cost overruns.
And maybe stick Calgary in there with a question mark next to it.
Size of the graphic should be 5" x 6.7" and high dpi suitable for print.
Recommended Skills
Employer Feedback
“Really nice work and fixed issues quickly. ”
TaxpayerDOTcom, Canada.
Top entries from this contest
-
richardwct Malaysia
-
richardwct Malaysia
-
mishrapeekay India
-
mishrapeekay India
Public Clarification Board
How to get started with contests
-
Post Your Contest Quick and easy
-
Get Tons of Entries From around the world
-
Award the best entry Download the files - Easy!